Project Home Design + Build · Oklahoma · Phase 03 of 06
Project Pulse This week
  • MonMillwork delivered to site — install begins Wednesday.
  • WedPlaster second coat, kitchen hood and range wall.
  • FriSite walk — photos posted to Project Stream by end of day.
  • May 28Next milestone — countertop template.
Project Line Message
You · 2:09 PM Can we look at the darker bronze for the entry? Read · 2:11 PM
G&G Studio · 2:14 PM Yes. Adding it to Decision 018 with the original finish beside it, so you can compare both before approving.
Project Line Direct communication, attached to the work
G&G Studio · Tue 9:40 AM Limestone samples are in. Three candidates for the entry floor — honed, brushed, and a lightly filled travertine as a comparison. ▯ entry-stone-samples.pdf
You · Tue 11:02 AM Yes, I love the honed limestone. Use that. Read · 11:04 AM
Make it a record:
G&G Studio · Tue 11:09 AM Filed for formal approval so it is documented against the drawings — one tap in the Decision Room and the order releases.
G&G Studio · Attached to Decision 018 Both entry hardware finishes, photographed on the actual door. ▯ bronze-dark.jpg ▯ bronze-original.jpg
You · 2:31 PM The darker one. It reads better against the brick. Delivered
Field · Wed 7:52 AM Millwork install underway. Crew found a framing bow behind the pantry run — shimming per detail, no schedule impact. ▯ pantry-wall-AM.jpg
Field · Wed 4:18 PM End of day. Pantry run set and level. ▯ pantry-wall-PM.jpg
G&G · Private · visible to you and Ashley only Holding a contingency conversation for Thursday’s call — nothing for the wider team yet.

Text · photos · PDFs · drawings · voice notes · links. Three notice levels — Message Action required Project alert — so you always know whether something is informational or needs a decision.

Decision Room Approvals, signed and time-stamped
018
Entry hardware finish
Two finishes attached from Project Line · photographed on the door
Open
The questionAged bronze or the darker oil-rubbed finish for the entry set — both photographed on the actual door.
Options01 Bronze, original · 02 Bronze, dark (added from Project Line, 2:14 PM)
Studio recommends02 — the darker finish holds against the brick and ages evenly.
DueFriday — the hardware order releases on approval.
014
Entry floor — honed limestone
Filed from Project Line · “Yes, I love the honed limestone. Use that.”
Waiting on you
013
Kitchen counters — soapstone, honed
Approved with signature · order released
Approved · May 12
011
Plaster sheen — hood wall
Approved · second coat under way this week
In field
009
Entry floor substrate
Observed in field · corrected per detail · closed
Resolved · Apr 30

One vocabulary, everywhere: Open · Waiting · Approved · In field · Resolved · Archived.

Financial Agreements · draws · payment
Draw 04 — Millwork & finishes
Per draw schedule · due on millwork delivery
$48,200
Draw 03 — Rough-in complete
Paid by ACH · receipt in House Book
$56,800 Paid · Apr 18

Large draws move by bank transfer; card is available for smaller invoices. Payment processing connects at launch.

Project PulseWhat is happening now

The living summary: this week on site, the next milestone, and what changed since you last signed in.

Millwork install beginsWed
Plaster second coat — kitchenThu
Site walk + photographyFri
Next milestone — countertop templateMay 28
Project StreamThe chronological record

Every update, photograph and document in order. The story of the project as it actually happened.

Field photography — 14 imagesWed
Weekly update — written summaryFri
Drawing revision C postedMay 09
Permit inspection passedMay 02
Material BoardSelections, held as one board

The finishes, fixtures and materials of your project in one living board — approved, pending and considered.

Honed limestone — entryDecision 014
Soapstone, honed — kitchenApproved
Aged brass — hardwareDecision 018
Rift white oak — millworkApproved
ProcurementFF&E · orders · tracking

The full furniture, fixture and equipment schedule — and where every ordered item actually is.

Range — 48″In production
Pendants — entry, pairIn transit
Vanity stone — slab 2 of 2Received
Custom sofa — workroomReleased
FieldConstruction, as it exists today

Site questions, progress photography and construction communication from the crew actually building it.

Pantry run set and levelWed PM
Framing bow — shimmed per detail · ResolvedWed AM
Plaster prep — hood wallTue
Site secured, weather coverMon
House Book · Building RecordThe permanent archive

At handover the project becomes its House Book: warranties, specifications, finish schedules, care instructions — and the full searchable history of Project Line, kept for as long as you own the building.

Finish schedule — all roomsPDF
Warranties — appliances + systems12 items
Care + maintenance — stone, oak, plasterPDF
Project Line archive — searchable1,214 messages